Installation Guide Oak Flooring Direct & Norske

Installation Guide Oak Flooring Direct & Norske Wood Flooring Products: 


General Fitting Guidelines:

Check every board carefully before installation for any defects & manufacturing faults. We cannot consider any claims regarding product defects after installation. Engineered flooring is not suitable for installations in wet rooms such as bathrooms, saunas or in similar rooms where there is a regular flow of water. A professional floor fitter should be used to install the product and a list of these can be found on www.cfa.org.uk or www.bwfa.co.uk failure to use a professional fitter could invalidate any warranty.

Sub floor & Moisture Content:

All sub floors must be prepared for installation in accordance with normal sub floor preparations procedures and accepted tolerances within the flooring industry. To BS8204-1, Before installing engineered flooring there are the following points to consider:

  • Moisture test – the test will be carried out using hygrometer hood or sleeve to BS8201 or CM-device if the screed manufacturer states and should not exceed the following moisture level:
  • Hygrometer <75% for floating & <65% for full bond. Floating floors installed over screed must also incorporate a DPM quality sheeting between the wood flooring and screed.
  • Cement based concrete 2.5% CM.
  • Anhydrite concrete 0.5% CM.
  • The sub floor should be sound, level and flat with a gap of no more than 3mm showing under a 2 Metre straight edge.
  • Load capacity – the sub floor has to be closed and a self supporting surface.
  • Cleanness test – the sub floor has to be in a clean and vacuumed condition.
  • For installation over timber sub floors the moisture content of these must be within +/- 2% of the product being installed.
  • The following conditions should be fulfilled before, during and after the installation.
  • Wood moisture content 8-11%.
  • Room temperature of a minimum of 18°C.
  • Relative humidity between 40% and 60%.
  • Walls – 8% maximum.

Readings of the above should be recorded prior to installation.

Sub Floor Guidelines: 

Engineered flooring, installed as a floating flooring configuration can be installed on all sub floors, which meet the above described requirements. Here are some examples:

  • All types of concrete sub floors, including hot water radiant sub floor systems.
  • Particleboard / Chipboard sub floor constructions.
  • Fibreboard sub floor constructions.
  • Existing flooring surfaces such as PVC, linoleum, natural stone slab and ceramic tiles.
  • Unsuitable sub floors – Textile surfaces and carpets.

Underfloor Heating Guidelines:

The sub floor surface temperature may never exceed 27°C. Electrical radiant sub floor heating systems installed as foil-heating element may be used only if the manufacturer of the heating element can ensure that the sub floor surface temperature is never above 27°C. If the sub floor temperature exceeds 27°C a barrier must be inserted under the floor in order to dissipate the heat and achieve the correct reading. A sub floor thermostat must be installed in order to control this temperature. The heating engineers installing the underfloor heating should provide evidence that the sub floor temperature is limited to 27°C.

Controlling the sub floor temperature should result in a surface wood floor temperature of around 24°C – 25°C and a room temperature of around 21°C. We do not recommend this temperature is exceeded at any time.

Due to the nature of the product gaps between boards, loss of filler and knots, can occur and small hairline cracks may appear in the veneers due to the use of the underfloor heating drying the wood.

Please note the following rules for the different sub floor types:

Concrete sub floors – If the engineered flooring system is installed over a concrete sub floor, you have to consider that possible residual moisture in the sub floor will permeate to the surface of the sub floor once it is covered with any type of floor covering. Based on the above-mentioned reason it is always necessary to install a 0.2mm polyethylene film or a liquid DPM as a moisture barrier over the concrete sub floor.

Concrete with hot water radiant heating systems – To ensure that radiant heating systems will work properly for many years to come, it is essential to plan and coordinate the different elements of the flooring construction (concrete, radiant heating system, engineered flooring.) All existing floor surfaces need to be removed prior to the installation of the new engineered flooring. In addition to the standard sub floor tests it is necessary to provide a certificate that the proper “heating-up and cooling-down phases” have been done. A correct heating-up and cooling-down of the concrete construction will be necessary in every season of the year. The heating-up and cooling-down phase: Refer to BS8201 or you can:

Start of the heating-up phase at the earliest 21 days after the cement-based concrete has been installed, for anhydrite concrete allow for at least 7 days.

Start the heating-up phase with a flow temperature of 23°C which has to remain constant for three days.

Increase the flow temperature daily by 5°C up to the maximum flow temperature.

Maintain the maximum flow temperature for three days without switching off the heater during the night.

After three days reduce the flow temperature daily by 10°C until you reach a surface temperature of 18°C.

Take the concrete moisture readings maximum 2.5% for concrete / 0.5% for anhydrite <75% R.H floating / <65% R.H glue down.

The sub floor surface temperature may never exceed 27°C, it is always necessary to install a 0.2mm polyethylene film or a liquid DPM as a moisture barrier underneath the underlay.

During and three days after the installation of the flooring panels, maintain a surface temperature of 18°C.

Three days after the installation you can start to gradually increase the flow temperature from 15°C up to the recommended generic temperature of the property. The temperature of the flow through to the pipes / electric mats should be set to its minimum setting until you are able to heat the sub floor up to its maximum of 27°C.

The following species are deemed not suitable for use with underfloor heating: Maple, Beach, Kempas

Recommended Methods of Fixing:

  • Wood Blocks Engineered / Solid Blocks (All sizes) – Glued to the sub floor / Fully Adhered Installation Only 
  • 13 / 14 / 15mm thick engineered wood flooring T&G Joint – Glued on the top of the groove and floated over a suitable underlay and vapour barrier or glued to the sub floor up to a width of 240mm. Above 240mm glue to the sub floor only.
  • 13/14/ 15mm thick engineered wood flooring Click Joint 5G type - As T& G install with no requirement to glue joints  
  • 18 / 20 / 21mm thick engineered – Float / Glued / Secret Nail up to a width of 190mm. Above 190mm the only methods we recommend are to secret nail or glue to the sub floor.

Installation Preparation:

Before starting the installation the engineered flooring has to be brought into the room where it will be installed or in a room with the same climate condition. The acclimatisation will be carried out as following:

  • In sealed unopened boxes.
  • For a time period of at least 48 hours.
  • flat laying with at least 50cm distance to the walls.
  • at a room temperature of at least 18°C.
  • at a relative humidity between 40% and 60%.

Installation Directions:

Engineered flooring looks its best when the engineered flooring panels are installed parallel to the light coming in through the windows. The only required installation direction is if you install engineered flooring over floor board. In this case you have to install the engineered flooring at a 90° angle to the existing hardwood floor boards.

After determine the best layout of the flooring and the starting wall, measure the width of the room and divide it by the width of the engineered flooring panels to determine the number of rows and width of the last row. If the last row is determined to be less than 60mm wide, it should be adjusted by cutting the first row length wise.

Since engineered flooring is made of organic materials, it is subject to certain movement behaviours (shrinkage / expansion) due to changes in climate conditions. It is necessary to leave gaps of minimum 10mm for the expansion in all parts of the structure i.e. walls, door frames, stairs and around pipes etc. Any vertical obstructions.

Through the shrinkage and expansion behaviour of engineered flooring you have to install transition mouldings / threshold strips in the following areas.

  • Door Throughways
  • Passageways
  • Single Room Length and / or with more than 10m

Installation:

Please ensure all wet trades including painting have finished and all moisture levels recorded as previously advised before commencing the installation. Check all panels for possible damages / Defects. Ensure you understand the difference between the tongue and the groove on the panel. Begin installing the first row from the left hand corner of the room with both tongue sides of the panels pointing towards the wall. Place spacers between the edge of the flooring panel and the wall to provide the correct space for expansion. Connect the second panel to the first by indirectly tapped using a hammer and push block, thereby joining the boards’ headers. Mark the last panel in the first row to the required length (place tongue to tongue) and cut. start the second row with the off cut from the last panel of the first row. Always make sure the off cut is at least 500mm long. Start all subsequent rows with the off cut piece from the previous row. Connect the second row to the first by placing the interlocking end of the new panel at an angle to the previously installed panel and then lower it into a horizontal position to lock then indirectly tapped using hammer and push block, thereby joining the boards’ headers. Ensure all the short ends are staggered at least 500mm. It is vital to maintain a minimum of 500mm between the ends of the boards in the adjacent rows (staggered).

Fitting around pipes:

Measure the position of the pipes and ark it on the panel, consider also the expansion. Take measurements from the spacers into account. Drill a hole of 16mm bigger than the pipe diameter expansion provision. Saw at a 45° angle to the holes. Apply glue to the sawn out piece and fit in with a pull bar. Again do not forget the spacers. If you have a wooden doorjamb, we recommend undercutting the wooden doorjamb according to the thickness of the flooring plus the possible underlay. Install the flooring now underneath the doorjamb – leave the necessary expansion gaps. In the case of completing your installation underneath a doorjamb we recommend that you remove the locking part of the protruding groove of the pre-installed panel with a utility knife or a pocket plane. The newly laid panel can now be pushed horizontally over the groove of the previously laid panel. Use high quality wood glue on top of the tongue to secure the connection if you have a doorjamb which cannot be shortend e.g. metal doorjamb we recommend that you cover the expansion gaps with mouldings or fill them with elastic acrylic sealants. After a correct installation of the flooring, install the transition mouldings / thresholds as well as wall mouldings.

After Installation:

Covering the boards with any form of protection may result in the board sweating and colour running, so we recommend this is only done for short term use and not days at a time. Use the recommended appropriate finish maintenance guidelines supplied by your dealer. All natural oiled and some UV oiled products should be re oiled / waxed after installation in order to provide extra protection and to seal the joints, please contact your local distributor for the recommended products.